Data Centre Stevenage

Gas Suppression Cylinder Stretch Testing | Acoustic Nozzel Upgrade

The Cylinders within this Data Centre Facility had reached their 10 Year lifecycle, and as such, they were required to be to stretch tested. This work was undertaken with minimal disruption and downtime.

We coordinated this works in line with further works to replace all the existing gas suppression nozzles with new Acoustic Nozzles. This provides protection of the sensitive data held onsite and reduces the Db levels of the system.